Solapur Thermal Power : FGD Addition Project   
Project Code 6000004969
Project Name Solapur Thermal Power : FGD Addition Project
Project Type Capital Project Status Active
Sector Power Project Stage Planning
Project Cost Rs. 792.00 Cr.   Project Phase Feasibility Report
NIC Subcode(s) Description
35102 Electric power generation by coal based thermal power plants
Facility Name Solapur Super Thermal Power Station Status Running 
Sector Power Main Energy Source Coal  
Commissioning Date 03-2017  Other Energy Sources Water, Fuel Oil  
Address NTPC Limited, Solapur Super Thermal Power Project, Post- Hotgi Station Tal South,
Solapur, Maharashtra
413215, India
Telephone 0217-2252504
Fax 0217-2252505
Owner National Thermal Power Corporation Limited National Thermal Power Corporation Limited Website http://www.ntpc.co.in/
Operator National Thermal Power Corporation Limited National Thermal Power Corporation Limited Website http://www.ntpc.co.in/

National Thermal Power Corporation Limited is planning to install a Flue Gas Desulphurization Unit (FGD) for a 1320 MW (2x660 MW) thermal power complex in Solapur, Maharashtra in order to comply with environmental norms. State approval will soon be concurred. Funding for the project has been sanctioned by the central government. Tenders for the same are expected soon. The project requirements are: absorber system, gas to gas heat exchanger, spray headers and nozzles, mist eliminators & washing, agitators, quenching spray system, slurry re-circulation pumps, oxidation blower, gypsum bleed pumps, limestone grinding system, limestone slurry pumps, vacuum belt filter system, auxiliary absorbent slurry pumps with drive motor, piping, valves, auxiliary absorbent tanks, limestone storage tank, limestone silos, process water storage and pumping system, booster fans, ducting, dampers along with supports, slurry piping along with associated valves, low height wet chimney, FGD control room, dozers, wet ball mills, bucket elevator, gypsum dehydration, piles, spray headers, cooling water tank, process water tank, emergency slurry tank, among others.

RFQs for design, supply, engineering, construction and commissioning of FGD are expected by the end of August 2018.

Expenditure Approval RFQ Date Release Date Start Date Completion Date Audit Date
Q2:2017 Aug/2018 Aug/2018 Q3:2019 Q1:2021 20/May/2019
Sell Electricity?
Name Project Role Designation Company City Phone Audit Date E-mail
Mr.Surjeet Singh Owner Additional General Manager National Thermal Power Corporation Limited National Thermal Power Corporation Limited Solapur 0217 - 2252543 20/05/2019
Equipments
Category Additional Details
Environmental
  • Scrubber
  • Flue-Gas Desulfurization(FGD)
  • Filters
Structural
  • Piling
  • Foundations
  • Building Supports
Piping
  • Pipe

Engineering Services
  • Structural
Contracting Services
  • Environmental