Gadarwara Greenfield Super Thermal Power Project (Stage-1)   
Project Code 6000003002
Project Name Gadarwara Greenfield Super Thermal Power Project (Stage-1)
Project Type Capital Project Status Active
Sector Power Project Stage Construction
Project Cost Rs. 12,865.92 Cr.  Project Phase Erection & Installation
NIC Subcode(s) Description
35102 Electric power generation by coal based thermal power plants
Facility Name Gadarwara Super Thermal Power Station Status Construction 
Sector Power Main Energy Source Coal  
Commissioning Date 04-2018  Other Energy Sources Water, Fuel Oil  
Address NTPC Limited, Gadarwara Super Thermal Power Project, P.O.: Gangai, Tehsil- Gadarwara,
Narsinghpur, Madhya Pradesh
487770, India
Telephone 07792-257101
Fax 07792-233310
Owner National Thermal Power Corporation Limited National Thermal Power Corporation Limited Website http://www.ntpc.co.in/
Operator National Thermal Power Corporation Limited National Thermal Power Corporation Limited Website http://www.ntpc.co.in/
Unit Name Unit Status Unit Category Commissioning Date
Unit-1 (Gadarwara STPS) Unit-1 (Gadarwara STPS) Construction Steam driven 03-2018
Unit-2 (Gadarwara STPS) Unit-2 (Gadarwara STPS) Construction Steam driven 04-2018
Company Name Company Classification
Bharat Heavy Electricals Ltd. Package Contractor

National Thermal Power Corporation Limited along with BTG and ESP contractor BHEL is carrying out the construction activities in a 1600 MW (2x800 MW) Stage-1 greenfield super-critical thermal power plant at the Dongargaon village, situated in the Narsinghpur district of Madhya Pradesh. Elecon Engineering is undertaking the coal handling plant activities. Boiler light up for unit-1 (800 MW) is expected in the December 2018. Moreover, turbo-generator box up for the same unit is expected in the November 2018. Currently, the owner is in process of investigation to install a flue gas desulphurization unit (FGD). Further RFQs are expected soon. The project requirement are: absorber system, gas to gas heat exchanger, spray headers and nozzles, mist eliminators & washing, agitators, quenching spray system, slurry re-circulation pumps, oxidation blower, gypsum bleed pumps, limestone grinding system, limestone slurry pumps, vacuum belt filter system, auxiliary absorbent slurry pumps with drive motor, piping, valves, auxiliary absorbent tanks, limestone storage tank, limestone silos, process water storage and pumping system, booster fans, ducting, dampers along with supports, slurry piping along with associated valves, low height wet chimney, FGD control room, dozers, wet ball mills, bucket elevator, gypsum dehydration, piles, spray headers, cooling water tank, process water tank, emergency slurry tank, mobile crane (30 MT), crane (20 MT), among others.

RFQs for procurement of mobile crane and crane of capacity 30 MT and 20 MT respectively are expected by the end of July 2018. RFQs for the supply, installation, erection and commissioning of a flue gas desulphurisation unit (FGD) are expected in the August 2018.

Expenditure Approval RFQ Date Release Date Start Date Completion Date Audit Date
Q1:2013 25/Jul/2018 28/Jul/2018 Q3:2013 Q3:2019 04/Apr/2019
Sell Electricity?
Name Project Role Designation Company City Phone Audit Date E-mail
Mr.Ram Kumar Owner General Manager National Thermal Power Corporation Limited National Thermal Power Corporation Limited Narsinghgarh 07790 - 220008 04/04/2019
Mr.V. M. Solanki Owner Deputy General Manager National Thermal Power Corporation Limited National Thermal Power Corporation Limited Narsinghpur 07791 - 220028 04/04/2019
Mr.Pankaj Sharma Package Contractor General Manager Bharat Heavy Electricals Ltd. Bharat Heavy Electricals Ltd. Narsinghpur 07790 - 220301 04/04/2019
Equipments
Category Additional Details
Storage
  • Tanks
  • Silos
Environmental
  • Flue-Gas Desulfurization(FGD)
  • Filters
  • Dust Fighter
Structural
  • Piling
  • Foundations
  • Elevators

Contracting Services
  • Environmental