Rajpura Thermal Power Plant - FGD Addition   
Project Code 6000004569
Project Name Rajpura Thermal Power Plant - FGD Addition
Project Type Capital Project Status Active
Sector Power Project Stage Engineering
Project Cost Rs. 700.00 Cr.   Project Phase Detailed Engineering
NIC Subcode(s) Description
35102 Electric power generation by coal based thermal power plants
Facility Name Rajpura Super Thermal Power Station Status Running 
Sector Power Main Energy Source Coal  
Commissioning Date 10-2014  Other Energy Sources Water, Fuel Oil  
Address Nabha Power Limited, P.O. Box No.28, Near Village Nalash,
Rajpura, Punjab
140401, India
Telephone 01762-277252
Fax -
Owner Nabha Power Limited Nabha Power Limited Website http://www.lntpowerdevelopment.com/
Operator Nabha Power Limited Nabha Power Limited Website http://www.lntpowerdevelopment.com/
Unit Name Unit Status Unit Category Commissioning Date
Unit - 1 (Rajpura STPS) Unit - 1 (Rajpura STPS) Running Steam driven 06-2014
Unit - 2 (Rajpura STPS) Unit - 2 (Rajpura STPS) Running Steam driven 10-2014

Nabha Power Limited, a subsidiary company of L&T Power Development Limited has obtained financial approval for the installation of an FGD in the 1400 MW (2x700 MW) Rajpura Super Thermal Power complex at Rajpura, Punjab, in order to comply with the new environmental norms. Approval from the state government is pending due to some internal state disputes. Tenders for the same is expected soon. The project requirements are: absorber system, gas-gas heater, spray headers and nozzles, mist eliminators & washing, agitators, quenching spray system, slurry re-circulation pumps, oxidation blower, gypsum bleed pumps,limestone grinding system, limestone slurry pumps, vacuum belt filter system, auxiliary absorbent slurry pumps with drive motor, piping, valves, auxiliary absorbent tanks, limestone storage tank, limestone silos, process water storage and pumping system, booster fans, ducting, dampers along with supports, slurry piping along with associated valves, low height wet chimney, FGD control room, dozers, wet ball mills, bucket elevator, gypsum dehydration, piles, spray headers, cooling water tank, process water tank, emergency slurry tank, among others.

RFQs for supply and installation of an FGD is expected by August 2018.

Expenditure Approval RFQ Date Release Date Start Date Completion Date Audit Date
Q2:2017 Aug/2018 Q3:Aug/2018 Q2:2019 Q4:2021 13/Feb/2020
Sell Electricity?
Name Project Role Designation Company City Phone Audit Date E-mail
Mr.Anand Saxena Owner Additional General Manager (Project) Nabha Power Limited Nabha Power Limited Chandigarh 8146019893 01/06/2019
Mr.Ashutosh Sharma Owner Senior Engineer (Project) Nabha Power Limited Nabha Power Limited Chandigarh 0172 - 4646845 01/06/2019
Equipments
Category Additional Details
Structural
  • Scaffolding
  • Piling
  • Elevators
Environmental
  • Flue-Gas Desulfurization(FGD)
  • Filters
Storage
  • Tanks
  • Silos

Contracting Services
  • Environmental