Satluj Jal Vidyut Nigam Limited's 44 MW (2x22 MW) greenfield hydroelectric power project located at the Jakhol village, in Uttarkashi district of Uttarakhand is getting delayed due to lack of DPR approval from the Government of Uttarakhand. EIA report has been prepared and submitted to the Uttarakhand Environment Protection and Pollution Control Board for conducting a public hearing. Further package wise bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, EOT crane, mobile crane, air compressor, tunnel boring machine, dozers, piles, elevators, building supports, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, Pelton turbine, pumps, spiral, casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, generator and its control panel, guide bearings, protection relays, transformer and its auxiliaries, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others.
01/03/2020
Satluj Jal Vidyut Nigam Limited's 44 MW (2x22 MW) greenfield hydroelectric power project located at the Jakhol village, in Uttarkashi district of Uttarakhand is got delayed due to lack of DPR approval from the Government of Uttarakhand. But recently TEA of DPR is accorded by GoUK in June 2019. FC is not granted yet for diversion of forest land, it is on the final stage to got approval from GoUK. The public hearing is already conducted in March 2019 and the final report submitted by Consultant along with EC, EIA&EMP report to GoUK in June 2019.SIA report has been approved by Govt. and private land acquisition was completed. However, tenders for civil work package (lot-2) is likely to be floated in Q2 2020. Further bids are expected soon. The project requirements are load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, EOT crane, mobile crane, air compressor, tunnel boring machine, dozers, piles, elevators, building supports, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, Pelton turbine, pumps, spiral, casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, generator and its control panel, guide bearings, protection relays, transformer and its auxiliaries, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others.
24/08/2017
SJVN is planning to construct a 51 MW Jakhol Sankri Hydroelectric Power Station near village Jakhol in district Uttarkashi of Uttarakhand. EIA studies are ongoing at present. The company is expected to apply for EC by April 2018 (tentatively).
Major requirements will be: Dam and Barrage construction, Cofferdam, Generator, 2 vertical Pelton turbines, Control Equipment, 4 Vertical Gates, EOT Crane, Desilting Tank, Steel-lined Penstock (ASTMA-537 Class-2), Surge Shaft, Butterfly Valve, Transformer, Tunnel, TBM (tunnel boring machine), Steel Pipes, Transmission lines, Substation among many others.