Myntdu Leshka Greenfield Hydroelectric Project (Stage-II)   
Project Code 6000005232
Project Name Myntdu Leshka Greenfield Hydroelectric Project (Stage-II)
Project Type Capital Project Status Active
Sector Power Project Stage Pre-Planning
Project Cost Rs. 2,881.19 Cr.  Project Phase Site Survey
NIC Subcode(s) Description
35101 Electric power generation by hydroelectric power plants
Facility Name Myntdu Leshka Hydroelectric Plant Stage-II Status Planning 
Sector Power Main Energy Source Water  
Commissioning Date 2026  Other Energy Sources Diesel, Fuel Oil  
Address Myntdu Leshka Hydroelectric Plant Stage-II, Trangblang village,
West Jaintia Hills, Meghalaya
793150, India
Telephone 0364-2590113
Fax -
Owner Meghalaya Energy Corporation Limited Meghalaya Energy Corporation Limited Website http://meghalaya.gov.in/
Operator Meghalaya Energy Corporation Limited Meghalaya Energy Corporation Limited Website http://meghalaya.gov.in/

Meghalaya Energy Corporation Limited is preparing the site survey report as directed by an EAC committee for a 210 MW (3x70 MW) Stage-II greenfield hydroelectric project situated at the right bank of Trangblang village in the West Jaintia Hills district of Meghalaya. TOR clearance was getting delayed and is now expected to be granted in September 2018. Moreover, DPR is getting prepared using in-house resources. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, EOT crane, mobile crane, air compressor, tunnel boring machine, dozers, piles, elevators, building supports, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, Francis turbine, pumps, spiral, casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, generator and its control panel, guide bearings, protection relays, transformer and its auxiliaries, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others.

RFQ for drilling, drifting works, and subsurface investigations is expected by the Q4 2018.

Expenditure Approval RFQ Date Release Date Start Date Completion Date Audit Date
Q1:2019 Q4:2018 Q4:2018 2020 2026 11/Mar/2020
Sell Electricity?
Name Project Role Designation Company City Phone Audit Date E-mail
Mr.E. W. Nongrum Owner Director Meghalaya Energy Corporation Limited Meghalaya Energy Corporation Limited Shillong* 0364 - 2591406 25/05/2019
Equipments
Category Additional Details
Valves
  • Butterfly Valve
  • Flapper Valve
  • Gate Valve
Turbine
  • Francis Turbine
Structural
  • Tunnel Boring Machine (TBM)
  • Stairways
  • Piling
  • Elevators
  • Cranes
  • Building Supports
Transportation
  • Truck
Storage
  • Tanks
Civil
  • Underground Piping
  • Earthwork
  • Drilling
  • Boring
Electrical
  • Transformer
  • Powerhouse
  • Cables
Control Room
  • Display Panel
  • Console
  • Alarms/trips/interlocks
Generator
  • Diesel Generator
Mechanical
  • Electro-mechanical

Engineering Services
  • Civil
  • Electrical
  • Mechanical
Contracting Services
  • Civil
  • Electrical
  • Mechanical