Udupi Super-Critical Thermal Power Expansion Project   
Project Code 6000003074
Project Name Udupi Super-Critical Thermal Power Expansion Project
Project Type Capital Project Status Active
Sector Power Project Stage Planning
Project Cost Rs. 11,500.00 Cr.   Project Phase Capital Approval
NIC Subcode(s) Description
35102 Electric power generation by coal based thermal power plants
Facility Name Udupi Thermal Power Station Status Running 
Sector Power Main Energy Source Coal  
Commissioning Date 09-2012  Other Energy Sources Water, Fuel Oil  
Address Udupi Thermal Power Station, Kolachuru, Yelluru Village, Nandikur Post,
Udupi, Karnataka
574113, India
Telephone 0820-2703309
Fax 0820-2703500
Owner Udupi Power Corporation Limited Udupi Power Corporation Limited Website http://www.adanipower.com/
Operator Udupi Power Corporation Limited Udupi Power Corporation Limited Website http://www.adanipower.com/
Unit Name Unit Status Unit Category Commissioning Date
Unit- 3 (Udupi TPS) Unit- 3 (Udupi TPS) Engineering Steam driven 11-2022
Unit - 4 (Udupi TPS) Unit - 4 (Udupi TPS) On Hold Steam driven 05-2023

Udupi Power Corporation Limited's 1600 MW expansion (2x800 MW) at the existing thermal power station of 1200 MW (2x600 MW) located in Udupi, Karnataka is getting delayed due to the pending power purchase agreement with the Karnataka Power Transmission Corporation Limited. Also, the owner is in search of financial institutions to fund the project. UPCL is a fully owned subsidiary of Adani Power Limited. Environmental clearance was granted in August 2017. Further bids are expected soon. The project requirement are: steam turbine and its auxiliaries, generator and its auxiliaries, supercritical technology boiler, water-cooled condenser, vacuum pumps, boiler feed pumps and its drives, feed pump motor, economizer, air preheater, deaerating heater and closed heaters, boiler drum, ID, FD and PA fans, superheater, suction basket strainer, furnace system, furnace chamber, ESP and its auxiliaries, chimney, ash handling system, water treatment plant, DM plant, fire fighting system, turbine oil purification system, switch-yard equipment, seawater intake and outfall system, air ventilation system, coal handling system, cranes, thermo mechanically treated steel, DG sets, rolling shutters,C&I system, down shop lead (DSL) crane, carbon steel and pipe, stacker cum reclaimer, wagon tippler, piles, reinforced steel, structural steel, MS & Electro forged gratings, conveyor belts, side arm charger, FGD, SCR, among others

RFQ for sea intake and outfall system contractor is expected by October 2018. RFQ for an EPC contractor is expected by November 2018, instead of Q3 2018.

Expenditure Approval RFQ Date Release Date Start Date Completion Date Audit Date
Q4:2018 Oct/2018 Oct/2018 Q3:2019 Q2:2023 31/Dec/2019
Sell Electricity?
Buy Fuel? Fuel Name Diesel
Name Project Role Designation Company City Phone Audit Date E-mail
Mr.Santosh Kumar Singh Owner Vice President (Projects) Adani Power (Jharkhand) Limited Adani Power (Jharkhand) Limited Ahmedabad 079 - 25557289 28/05/2019
Mr.Mahantesh Hiramath Owner Senior Manager (Mechanical) Udupi Power Corporation Limited Udupi Power Corporation Limited Udupi 2703310 28/05/2019
Mr.Vishwanath Gowda Owner Chief Engineer (Project) Udupi Power Corporation Limited Udupi Power Corporation Limited Udupi 9513945240 28/05/2019
Equipments
Category Additional Details
Instrumentation
  • Sensors
  • SCADA
  • PLC
  • DCS
Valves
  • Safety Relief Valve
  • Pressure Reducing Valve
Utilities
  • Water
  • Fuel
Structural
  • Stacker and Reclaimer
  • Piling
  • Foundations
  • Elevators
  • Cranes
  • Building Supports
  • Frame
Boiler
  • Fire Tube
Piping
  • Pipe
  • Conduit
Raw material
  • Water
  • Coal
Electrical
  • Wire
  • Transformer
  • Switchyard
  • Generation
  • Distribution
  • DC System
  • Cables
Civil
  • Underground Piping
  • Fencing
  • Excavation
  • Earthwork
  • Drilling
Control Room
  • Security Cameras
  • Explosion Proof
  • Display Panel
  • Console
Environmental
  • Flue-Gas Desulfurization(FGD)
  • Filters
  • Electrostatic Precipitator (ESP)
  • Dust Fighter
  • Wastewater Treatment
Generator
  • Hot Air Generator

Engineering Services
  • Civil
  • Electrical
  • Mechanical
Contracting Services
  • Civil
  • Electrical
  • Mechanical
Date: 10 Aug, 2017
The proposed Udupi power plant 1600 MW will require skilled and semi-skilled personnel during construction and operational phase. Nearly 1500 personnel will be required during construction phase.