Talcher Brownfield Super-critical Thermal Power Project (Stage-III)   
Project Code 6000005218
Project Name Talcher Brownfield Super-critical Thermal Power Project (Stage-III)
Project Type Capital Project Status Active
Sector Power Project Stage Planning
Project Cost Rs. 9,785.00 Cr.   Project Phase Clearances
NIC Subcode(s) Description
35102 Electric power generation by coal based thermal power plants
Facility Name Talcher Thermal Power Station Status Running 
Sector Power Main Energy Source Coal  
Commissioning Date 1965  Other Energy Sources Fuel Oil, Water  
Address NTPC Talcher Thermal Power Station, P.O. : Talcher,
Angul, Orissa
759101, India
Telephone 06760-249101
Fax 06760-249053
Owner National Thermal Power Corporation Limited National Thermal Power Corporation Limited Website http://www.ntpc.co.in/
Operator National Thermal Power Corporation Limited National Thermal Power Corporation Limited Website http://www.ntpc.co.in/

National Thermal Power Corporation Limited has been accorded environmental clearance in September 2018 for a 1320 MW (2x660 MW) brownfield ultra super-critical technology thermal power plant in the existing premises of the old 460 MW (4x60 + 2x110 MW) Talcher Thermal Power Station at the Talcher village situated in the Angul district of Odisha. The RFQs are getting delayed due to pending clearance from the state's high-level clearance committee. The foundation stone of the project is scheduled to be laid on September 22. BHEL, L&T, Doosan Power, R-Infra are the major bidders for the main plant package bid. The award is held up by NTPC due to the absence of a state government approval. Further bids are expected soon. The project requirements are: steam turbine, generator, boiler, water-cooled condenser, vacuum pumps, boiler feed pumps and its drives, feed pump motor, furnace system, furnace chamber, bed media and fuel feed system, air supply and distribution system, soot blowing system, ESP, chimney, ash handling system, water treatment plant, DM plant, fire fighting system, coal handling system, cooling towers, air preheater, heat exchanger, ID, FD and PA fans, HT and LT motors, turbine oil purification system, switch-yard equipment, cranes, thermo mechanically treated steel, DG sets, rolling shutters, fencing materials, down shop lead (DSL) crane, carbon steel and pipe, stacker cum reclaimer, wagon tippler, piles, reinforced steel, structural steel, MS & Electro forged gratings, conveyor belts, side arm charger, FGD, SCR, among others.

RFQ for raw water, make-up water system, and associated civil works package are expected by November 2018, instead of June 2018. RFQ for the make-up water pipes package is expected by November 2018, instead of June 2018.

Expenditure Approval RFQ Date Release Date Start Date Completion Date Audit Date
Q3:2018 Nov/2018 Nov/2018 2019 2023 02/Feb/2019
Sell Electricity?
Buy Fuel? Fuel Name Diesel
Name Project Role Designation Company City Phone Audit Date E-mail
Mr.Jnanendra Kumar Mohanty Owner Deputy General Manager National Thermal Power Corporation Limited National Thermal Power Corporation Limited Angul 9437049104 02/02/2019
Mr.Bailochan Sahoo Owner Deputy General Manager National Thermal Power Corporation Limited National Thermal Power Corporation Limited Angul 06760 - 266306 02/02/2019
Equipments
Category Additional Details
Structural
  • Piling
Piping
  • Pipe
  • Hoses
  • Conduit
  • Fastners
Pumps
  • Reciprocating Pump
Raw material
  • Water

Engineering Services
  • Structural
Contracting Services
  • Structural