Visakhapatnam-Vijaywada-Secuberabad Petroleum Product Pipeline Expansion Project   
Project Code 6000004931
Project Name Visakhapatnam-Vijaywada-Secuberabad Petroleum Product Pipeline Expansion Project
Project Type Capital Project Status Active
Sector Oil & Gas Project Stage Engineering
Project Cost Rs. 2,485.00 Cr.   Project Phase Detailed Engineering
NIC Subcode(s) Description
49300 Transport via pipeline
Facility Name Visakhapatnam Vijaywada Secuberabad Pipeline (HPCL) Status Running 
Sector Oil & Gas Main Energy Source Electricity  
Commissioning Date 2003  Other Energy Sources  
Address Hindustan Petroleum Corporation Limited, Vijayawada POL Terminal, Kondapalli,
Vijayawada, Andhra Pradesh
560052, India
Telephone 0866-22535401
Fax -
Owner Hindustan Petroleum Corporation Limited Hindustan Petroleum Corporation Limited Website http://www.hindustanpetroleum.com
Operator Hindustan Petroleum Corporation Limited Hindustan Petroleum Corporation Limited Website http://www.hindustanpetroleum.com

Hindustan Petroleum Corporation Limited has hired MECON Limited as an EPMC contractor to expand its Visakhapatnam- Vijayawada- Secunderabad petroleum product pipeline from the proposed Dharmapuri POL terminal while also expanding the throughput capacity from 5.682 MMTPA to 8 MMTPA. The total length of the pipeline is 572 Km. They are also planning to lay a 1.1 km subsea pipeline from OSTT to SS Jetty for augmentation of tanker discharge facilities. PJR Project Constructions Pvt Ltd is doing the civil and construction work at IPS1, Rajahmundry, IPS2, Vijayawada, Suryapet, IPS3, and SV17 is in progress and expected to completed soon. The mainline pumping unit of pumping station Rajahmundry and Vijayawada have been dispatched from Flowserve and are in transit. Moreover, composite work like equipment foundations, roads, drains, piping, cable trenches, cable tray erection, process piping installation, sump tank fabrication, and EOT crane erection are under commissioning at compressor stations IPS1, IPS2, and IPS3. Long lead items like Pressure Control Valves, Ultrasonic Flow Meters, High Voltage switchgear, Telecom system, Check and Gate valves have already been delivered to sites in November 2018. Erection of fire water tank and hydro testing work for compressor station ISP1, ISP2, and ISP3 have already been completed. 4 mainline pumps have already received at pumping station ISP1 and ISP3, erection work of pumps is completed and mechanical and electrical installation work is in progress. Moreover, PLC up-gradation work for existing pumping station of Vizag, Rajahmundry, Vijayawada, and Suryapet have already been completed. Further, 3 mainline pumps one for each to Rajahmundry, Vijayawada, and IPS2 have already been delivered on site in January 2019, and the installation work for the same is going on soon. Mechanical work of the project is expected to completed by April 2019. All the procurement in this project has been completed. Further RFQs are expected soon.

RFQ for the pre-commissioning work for the sub-sea pipeline is expected by May 2019. RFQ for the pre-commissioning work for the capacity expansion pipeline is expected by June 2019.

Expenditure Approval RFQ Date Release Date Start Date Completion Date Audit Date
Q2:2016 May/2019 May/2019 Q4:2016 Sep/2019 23/Mar/2019
Buy Electricity?
Name Project Role Designation Company City Phone Audit Date E-mail
Mr.Yuvraj Singh Owner General Manager (Projects) Hindustan Petroleum Corporation Limited Hindustan Petroleum Corporation Limited Vijayawada 080 - 22535445 08/04/2019
Mr.Ramesh Owner General Manager (Projects) Hindustan Petroleum Corporation Limited Hindustan Petroleum Corporation Limited Bangalore 080 - 22535401 23/03/2019 ramramesh@hpcl.in

Engineering Services
  • Civil
  • Electrical
  • Mechanical
Contracting Services
  • Civil
  • Electrical
  • Mechanical
  • Instrumentation