Kanai Chatta-Shrirampur Greenfield Pipeline Project   
Project Code 6000005077
Project Name Kanai Chatta-Shrirampur Greenfield Pipeline Project
Project Type Capital Project Status Active
Sector Oil & Gas Project Stage Engineering
Project Cost Rs. 1,300.00 Cr.  Project Phase Basic Engineering
NIC Subcode(s) Description
49300 Transport via pipeline
Facility Name Kanai Chatta-Shrirampur Pipeline (HEPL) Status Planning 
Sector Oil & Gas Main Energy Source Electricity  
Commissioning Date 2021  Other Energy Sources  
Address H-Energy Private Limited, Kanai Chatta,
East Midnapore, West Bengal
721423 , India
Telephone 022-25715100
Fax 022-25763777
Owner H-Energy Private Limited H-Energy Private Limited Website http://www.henergy.com
Operator H-Energy Private Limited H-Energy Private Limited Website http://www.henergy.com

H-Energy Private was awarded the authorization for laying, building and operation of Kanai - Chatta - Shrirampur greenfield pipeline with a capacity of 7.20 MMSCMD on July 2019 by PNGRB. The length of the main trunk line is 242 Km with 24" diameter, and there will be 73 Km spur lines as follows: Haldia spur line 24" X 20 Km, Kulia - Kolaghat spur line 24" x 02 Km, Kamina - Uluberia spurline 24" X 02 Km, Krishna Rampur - Kolkata 24" x 02 Km, Malipukur - Bardhhaman 24" x 02 Km, JHBDPL spur line 24" X 02 Km. Due to continue protest of locals in Kanai-Chatta the ROW is not done completely and also due to the COVID-19 pandemic there is no such progress in the project. RFQs are still on the delay and expected to be resume by end of this year. Equipment to be required are: line pipes, coatings, valves, actuators, scraper traps, Quick Opening End Closure (QOEC), pig signallers, Flow tees, insulating joints, induction bends, flow meters (metering stations), natural gas compressors, filters, ball valves, flanges, seamless fittings, globe valves, check valves, gaskets. Instrumentation: SCADA, flow pressure, temperature gauges, transmitters, Optical Fiber Cables (OFC).

RFQ for detailed engineering work is expected by December-2020.

Expenditure Approval RFQ Date Release Date Start Date Completion Date Audit Date
Q3:2017 Dec/2020 Feb/2021 Q1:2020 Q2:2022 15/Sep/2020
Name Project Role Designation Company City Phone Audit Date E-mail
Mr.Shantanu Kumar Owner Manager (Contracts and Procurement) H-Energy Private Limited H-Energy Private Limited East Midnapore 022 - 25715100 10/02/2020 nshaikh@henergy.com