Satluj Jal Vidyut Nigam Limited(SJVNL) plans to construct a 175MW greenfield hydroelectric plant in Bardang, District-Lahaul & Spiti of Himachal Pradesh. It is a run-of-the-river-type project proposed to harness the hydel potential of the river Chenab. The diversion structure is located about 10 km upstream of Udaipur town in Lahaul and Spiti district and the powerhouse site is near Udaipur Town. WAPCOS LTD. is preparing the DPR of the project. Ramkey Enviro Services Ltd. is preparing EIA/EMP report for the same. The SIA study is in progress and it is in the advanced stage of completion. CWC has approved the hydrology report of the project. Geotechnical investigation and topographical surveys have been completed and it was approved by GSI.WAPCOS has also been a PMC for the project. Detailed design of the dam and its allied structures have been completed and the TEC of the project is yet to be granted by CEA. Package-wise bids are expected. Preparation of tender is yet to start for civil works. Further bids are expected soon. The major requirement will be a Pelton turbine, turbine-generator (alternator), station transformers, generator transformer, dumpers/loaders, excavators, TBM (tunnel boring machine), raise boring machine, unit auxiliary transformers (UAT), air compressor, digital governor, trash rack, main inlet valve (MIV), butterfly valve, non-return valve, radial gates, vertical lift gates, steel-lined penstock, EOT crane, transmission towers, power cables, monitor and monitor control unit, computerized control system, fireproofing system (Mulsifyer System, sprinkler system, etc), forced air circulation system (ID fans, blower, etc) among others.
29/02/2024
Satluj Jal Vidyut Nigam Ltd (SJVNL) plans to construct a 175MW greenfield hydroelectric plant in Bardang, District-Lahaul & Spiti , State - Himachal Pradesh. WAPCOS Ltd. is preparing the DPR. Techno-economic clearance of the DPR has been granted. Ramkey Enviro Services Ltd. has prepared the EIA/EMP report and the report is under approval stage at MoEF level. SIA study has been completed. CWC has approved the hydrology report. Forest clearance (stage-1) is pending at DFO. WAPCOS has also been selected as PMC. Preparation of the civil work package tender is in progress and its specification finalization has been completed. Further bids are expected soon. The major requirement will be a Pelton turbine, turbine-generator (alternator), station transformers, generator transformer, dumpers/loaders, excavators, TBM (tunnel boring machine), raise boring machine, unit auxiliary transformers (UAT), air compressor, digital governor, trash rack, main inlet valve (MIV), butterfly valve, non-return valve, radial gates, vertical lift gates, steel-lined penstock, EOT crane, transmission towers, power cables, monitor and monitor control unit, computerized control system, fireproofing system (Mulsifyer System, sprinkler system, etc), among others.
09/10/2023
Satluj Jal Vidyut Nigam Ltd (SJVNL) plans to construct a 175MW greenfield hydroelectric plant in Bardang, District-Lahaul & Spiti in Himachal Pradesh. It is a run-off-the-river-type project for harness the hydel potential of the river Chenab. WAPCOS Ltd. is preparing the DPR of the project. Techno-economic clearance of the DPR has been granted. Ramkey Enviro Services Ltd. has completed the preparation of EIA/EMP report and it is under examination at MoEF. The SIA report has been completed and it is yet to be approved. CWC has approved the hydrology report of the project. WAPCOS has also been selected as PMC. Package-wise bids are expected. Preparation of the tender is in progress for civil works and its specification finalization has been completed. Further bids are expected soon. The major requirement will be a Pelton turbine, turbine-generator (alternator), station transformers, generator transformer, dumpers/loaders, excavators, TBM (tunnel boring machine), raise boring machine, unit auxiliary transformers (UAT), air compressor, digital governor, trash rack, main inlet valve (MIV), butterfly valve, non-return valve, radial gates, vertical lift gates, steel-lined penstock, EOT crane, transmission towers, power cables, monitor and monitor control unit, computerized control system, fireproofing system (Mulsifyer System, sprinkler system, etc), among others.
30/06/2023
Satluj Jal Vidyut Nigam Ltd (SJVNL) plans to construct a 175MW greenfield hydroelectric plant in Bardang, District-Lahaul & Spiti in Himachal Pradesh. It is a run-of-the-river-type project proposed to harness the hydel potential of the river Chenab. WAPCOS Ltd. is preparing the DPR of the project. Techno-economic clearance of the DPR has been granted. Ramkey Enviro Services Ltd. is preparing EIA/EMP report and it is in an advanced stage for completion. The SIA report has been completed and it is yet to be approved. CWC has approved the hydrology report of the project. WAPCOS has also been selected as PMC. Package-wise bids are expected. Preparation of tender is in progress for civil works and its specification is yet to be finalized. Further bids are expected soon. The major requirement will be a Pelton turbine, turbine-generator (alternator), station transformers, generator transformer, dumpers/loaders, excavators, TBM (tunnel boring machine), raise boring machine, unit auxiliary transformers (UAT), air compressor, digital governor, trash rack, main inlet valve (MIV), butterfly valve, non-return valve, radial gates, vertical lift gates, steel-lined penstock, EOT crane, transmission towers, power cables, monitor and monitor control unit, computerized control system, fireproofing system (Mulsifyer System, sprinkler system, etc), among others.
31/03/2023
Satluj Jal Vidyut Nigam Ltd (SJVNL) plans to construct a 175MW greenfield hydroelectric plant in Bardang, District-Lahaul & Spiti in Himachal Pradesh. It is a run-of-the-river-type project proposed to harness the hydel potential of the river Chenab. WAPCOS Ltd. is preparing the DPR of the project. Techno-economic clearance of the DPR has been granted. Ramkey Enviro Services Ltd. is preparing EIA/EMP report. The SIA study is in progress and it is in an advanced stage of completion. CWC has approved the hydrology report of the project. Geotechnical investigation and topographical surveys have been completed and approved by GSI. WAPCOS has also been selected as PMC. Package-wise bids are expected. Preparation of tender is in progress for civil works and its specification is yet to be finalized. Further bids are expected soon. The major requirement will be a Pelton turbine, turbine-generator (alternator), station transformers, generator transformer, dumpers/loaders, excavators, TBM (tunnel boring machine), raise boring machine, unit auxiliary transformers (UAT), air compressor, digital governor, trash rack, main inlet valve (MIV), butterfly valve, non-return valve, radial gates, vertical lift gates, steel-lined penstock, EOT crane, transmission towers, power cables, monitor and monitor control unit, computerized control system, fireproofing system (Mulsifyer System, sprinkler system, etc), among others.
08/12/2022
Satluj Jal Vidyut Nigam Limited (SJVNL) plans to construct a 175MW greenfield hydroelectric plant in Bardang, District-Lahaul & Spiti in Himachal Pradesh. It is a run-of-the-river-type project proposed to harness the hydel potential of the river Chenab. The diversion structure is located about 10 km upstream of Udaipur town in Lahaul and Spiti district and the powerhouse site is near Udaipur Town. WAPCOS LTD. is preparing the DPR of the project. Ramkey Enviro Services Ltd. is preparing EIA/EMP report for the same. The SIA study is in progress and in an advanced stage of completion. CWC has approved the hydrology report of the project. Geotechnical investigation and topographical surveys have been completed and approved by GSI. WAPCOS has also been selected as a PMC for the project. Detailed design of the dam and its allied structures have been completed but the TEC of the project is yet to be granted by CEA. Package-wise bids are expected. Preparation of tender is yet to start for civil works. Further bids are expected soon. The major requirement will be a Pelton turbine, turbine-generator (alternator), station transformers, generator transformer, dumpers/loaders, excavators, TBM (tunnel boring machine), raise boring machine, unit auxiliary transformers (UAT), air compressor, digital governor, trash rack, main inlet valve (MIV), butterfly valve, non-return valve, radial gates, vertical lift gates, steel-lined penstock, EOT crane, transmission towers, power cables, monitor and monitor control unit, computerized control system, fireproofing system (Mulsifyer System, sprinkler system, etc), among others.