SJVN Thermal Private Limited is a wholly-owned subsidiary of SJVN. Main plant EPC package contractor L&T Ltd. along with SJVN is developing a 1320 MW (2x660 MW) greenfield super-critical thermal power plant at the village Chausa, in the Buxar district of Bihar. The PMC of the main plant was awarded to NTPC. Sub-contractor RITEs ltd. is constructing railway siding work and it is in the advanced stage of completion. Civil works for BTG are in progress and it is in the advanced stage of completion. BHEL was the EPC contractor for all BOP works. Erection and installation of BOP works are in progress. Construction works were getting delayed due to lock down and construction work is being disrupted by locals frequently. Civil and structural works are in progress for FGD and ESP units. Procurement of mechanical equipment for FGD is in progress. Bid evaluation is in progress for the DeNox system. The preparation of the tender is in progress for the ball mill and its technical specification is yet to be finalized. Further bids are expected soon. Project requirements are rolling shutters, fencing materials, down shop lead (DSL) crane, carbon steel and pipe, Cu Ni / Al bronze tubes, stacker cum reclaimer, wagon tippler, piles, reinforced steel, structural steel, MS & Electro forged gratings, conveyor belts, side arm charger, dozers. Absorber system, gas-gas heater, spray headers and nozzles, mist eliminators & washing, agitators, quenching spray system, limestone grinding system, vacuum belt filter system, booster fans, ducting, low height wet chimney, FGD control room, dozers, wet ball mills, bucket elevator, gypsum dehydration, piles, spray headers, pumps (gypsum bleed, limestone slurry, auxiliary absorbent slurry with drive motor), tanks (absorbent, limestone storage, cooling water, process water, emergency slurry), silos, among others.
16/02/2023
SJVN Thermal Pvt. Ltd. is a wholly-owned subsidiary of SJVN. Ltd. is developing a 1320 MW (2x660 MW) greenfield super-critical thermal power plant at the village of Chausa, in the Buxar district of Bihar. L&T Ltd. has been selected as the main plant EPC package contractor and BTG supplier for the project. NTPC has been selected as PMC. Sub-contractor RITEs Ltd. is developing railway siding work. Civil works for BTG are in progress and it is in the advanced stage of completion. BHEL is the EPC contractor for all BOP works. Construction works were getting delayed due to work is being disrupted by locals frequently. Apart from that, slow progress in mobilization and transportation of the CW system, and AHP equipment further delayed the project. Civil and structural works are in progress for FGD and ESP units. Erection and installation of De-Nox system is yet to be started. Preparation of tender is in progress for the limestone and gypsum handling system and its specification is yet to be finalized. Further bids are expected soon. Project requirements are piles, reinforced steel, structural steel, MS & Electro forged gratings, limestone grinding system, vacuum belt filter system, FGD control room, dozers, wet ball mills, bucket elevator, gypsum dehydration, piles, pumps (gypsum bleed, limestone slurry, auxiliary absorbent slurry with drive motor), tanks (absorbent, limestone storage, cooling water, process water, emergency slurry), silos, among others.
09/12/2022
SJVN Thermal Pvt. Ltd. is a wholly-owned subsidiary of SJVN. Ltd. Main plant EPC package contractor L&T Ltd. along with SJVN is developing a 1320 MW (2x660 MW) greenfield super-critical thermal power plant at the village Chausa, in the Buxar district of Bihar. PMC package has been awarded to NTPC. Sub-contractor RITEs Ltd. is constructing railway siding work and it is in the advanced stage of completion. Civil works for BTG are in progress and it is in the advanced stage of completion. BHEL is the EPC contractor for all BOP works. Erection and installation of BOP works are in progress. Construction works were getting delayed due to lock down and construction work is being disrupted by locals frequently. Civil and structural works are in progress for FGD and ESP units. Procurement of mechanical equipment for FGD is in progress. Bid evaluation is in progress for the DeNox system. The preparation of the tender is in progress for the ball mill and its technical specification is yet to be finalized. Further bids are expected soon. Project requirements are rolling shutters, fencing materials, down shop lead (DSL) crane, carbon steel and pipe, Cu Ni / Al bronze tubes, stacker cum reclaimer, wagon tippler, piles, reinforced steel, structural steel, MS & Electro forged gratings, conveyor belts, side arm charger, dozers. Absorber system, gas-gas heater, spray headers and nozzles, mist eliminators & washing, agitators, quenching spray system, limestone grinding system, vacuum belt filter system, booster fans, ducting, low height wet chimney, FGD control room, dozers, wet ball mills, bucket elevator, gypsum dehydration, piles, spray headers, pumps (gypsum bleed, limestone slurry, auxiliary absorbent slurry with drive motor), tanks (absorbent, limestone storage, cooling water, process water, emergency slurry), silos, among others.
21/10/2022
SJVN Thermal Private Limited is a wholly-owned subsidiary of SJVN.SJVN awarded M/S L&T power as an EPC package contractor for the main plant works to set up a 1320 MW (2x660 MW) greenfield super-critical thermal power plant at the village Chausa, in the Buxar district of Bihar. The PMC of the main plant was awarded to NTPC. Sub-contractor RITEs ltd. has completed railway siding package -3 and civil works, and land acquisition has been completed. Power transmission works are under progress for the same. The construction of railroads from coal mines the project is in the advanced stage of the competition. Civil works for BTG are in progress and it is in the advanced stage of completion. BHEL was the EPC contractor for all BOP works. All civil, structural, architectural, and excavation works for BOP are in progress. Construction works are delayed due to State government restrictions on the transportation of aggregates, sand, etc. and construction work is being disrupted by locals frequently.PT plant works and CW system works are in progress. Erection and installation of the switchyard are in progress and ABB Ltd. was the sub-contractor for the same. Civil and structural works are in progress for FGD and ESP units. The erection of mechanical equipment is yet to start for the same. The chlorine dosing system was awarded to Minimax Dosing Pvt. Ltd.Preparation of tender is in progress for the DeNox system and its technical specification is yet to be finalized. Further bids are expected soon. The project requirements are: steam generator and its auxiliaries, steam turbine, super-critical boiler, water-cooled condenser, air preheater, vacuum pumps, boiler feed pumps, and their drives, feed pump motor, deaerating heater and closed heaters, condensate extraction pumps, suction basket strainer, furnace system, furnace chamber, air supply, and distribution system, soot blowing system, ESP, chimney (275 m), ash handling system, water treatment plant, DM plant, fire fighting system, turbine oil purification system, switch-yard equipment, cranes, Thermomechanically treated steel, DG sets, rolling shutters, fencing materials, down shop lead (DSL) crane, carbon steel and pipe, Cu Ni / Al bronze tubes, stacker cum reclaimer, wagon tippler, piles, reinforced steel, structural steel, MS & Electro forged gratings, conveyor belts, side arm charger, dozers, among others.
09/08/2022
SJVN Thermal Private Limited is a wholly-owned subsidiary of SJVN.SJVN awarded M/S L&T power as EPC package contractor for the main plant works to set up a 1320 MW (2x660 MW) greenfield super-critical thermal power plant at village Chausa, in the Buxar district of Bihar. Investment approval has been accorded by CEA and the loan has been transferred to the owner by the Ministry of Power. The PMC of the main plant is awarded to NTPC.M/S RITEs ltd. was selected as project management and bid processing consultant for the railway siding works. The construction of railroads from coal mines to the project is in progress. Excavation and supply of ballast were completed. Land demarcation and equipment mobilization works were completed. Pilling works are under progress by Bhogwti Construction. Civil works for BTG are in progress. BHEL was selected as an EPC contractor for all BOP works. All civil, structural, architectural, and excavation works for BOP are in progress. Construction works getting delayed due to State government restrictions on transportation of aggregates, sand, etc. and construction work is being disrupted by locals frequently.PT plant works and CW system works just started and civil and structural works are the initial phase of construction. The switchyard package was awarded to ABB Ltd. and erection and installation of the unit transformer are in progress and switchyard works are yet to start for the same.ESP works are in progress and civil, and structural works are in progress for FGD units. The chlorine dosing system was awarded to Minimax Dosing Pvt. Ltd.Preparation of tender is in progress for railway siding package -5 and its technical specification has been finalized and tender was getting delayed due to design approval. Further bids are expected soon. The project requirements are: steam generator and its auxiliaries, steam turbine, super-critical boiler, water-cooled condenser, air preheater, vacuum pumps, boiler feed pumps, and its drives, feed pump motor, deaerating heater and closed heaters, condensate extraction pumps, suction basket strainer, furnace system, furnace chamber, air supply, and distribution system, soot blowing system, ESP, chimney (275 m), ash handling system, water treatment plant, DM plant, fire fighting system, turbine oil purification system, switch-yard equipment, cranes, Thermomechanically treated steel, DG sets, rolling shutters, fencing materials, down shop lead (DSL) crane, carbon steel and pipe, Cu Ni / Al bronze tubes, stacker cum reclaimer, wagon tippler, piles, reinforced steel, structural steel, MS & Electro forged gratings, conveyor belts, side arm charger, dozers, among others.
11/05/2022
SJVN Thermal Private Limited is a wholly-owned subsidiary of SJVN.SJVN awarded M/S L&T power as EPC package contractor for the main plant works to set up a 1320 MW (2x660 MW) greenfield super-critical thermal power plant at village Chausa, in the Buxar district of Bihar. Investment approval has been accorded by CEA and the loan has been transferred to the owner by the Ministry of Power. The PMC of the main plant is awarded to NTPC. The construction of railroads from coal mines to the project is yet to start and all packages of railway siding for the same were awarded to M/S RITEs ltd. as project management and bid processing consultant for the same. Pilling works are under progress by Bhogwti Construction. Civil works for BTG are in progress and it is in the initial phase of construction. BHEL was selected as an EPC contractor for all BOP works. All civil, structural, architectural, and excavation works for BOP are in progress. Construction works getting delayed due to State government restrictions on transportation of aggregates, sand, etc. and construction work is being disrupted by locals frequently.PT plant works and CW system works just started and civil and structural works are the initial phase of construction. The switchyard package was awarded to ABB Ltd. and erection and installation of the unit transformer are in progress and switchyard works are yet to start for the same.ESP works are in progress and civil, and structural works are in progress for FGD units. The chlorine dosing system was awarded to Minimax Dosing Pvt. Ltd.Preparation of tender is in progress for railway siding package -5 and its technical specification is yet to finalize. Further bids are expected soon. The project requirements are: steam generator and its auxiliaries, steam turbine, super-critical boiler, water-cooled condenser, air preheater, vacuum pumps, boiler feed pumps, and its drives, feed pump motor, deaerating heater and closed heaters, condensate extraction pumps, suction basket strainer, furnace system, furnace chamber, air supply, and distribution system, soot blowing system, ESP, chimney (275 m), ash handling system, water treatment plant, DM plant, fire fighting system, turbine oil purification system, switch-yard equipment, cranes, Thermomechanically treated steel, DG sets, rolling shutters, fencing materials, down shop lead (DSL) crane, carbon steel and pipe, Cu Ni / Al bronze tubes, stacker cum reclaimer, wagon tippler, piles, reinforced steel, structural steel, MS & Electro forged gratings, conveyor belts, side arm charger, dozers, among others.