SJVN Ltd. plans to develop a 232 MW greenfield hydroelectric plant in the village of Purthi, District- Chamba, Himachal Pradesh. WAPCOS Ltd. is preparing the DPR of the project. Mantec Consultants is preparing an EIA / EMP report for the project. The hydrology report of the project has been approved by the CWC. Detailed design and drawing of the civil, hydro-mechanical, and electro-mechanical works have been completed. Drilling and drifting works have been completed. The geotechnical investigation and topographical survey report have been approved by the GSI. Forest clearance stage 1 is pending at the DFO. The approach road construction is in progress slowly due to the unfavorable weather condition. WAPCOS has been selected as the PMC of the project. Preparation of tender is yet to be started for the civil works package. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, elevators, building supports, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, Pelton turbine, pumps, spiral, casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, generator and its control panel, guide bearings, protection relays, transformer and its auxiliaries, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries, governor panel, cables, transmission lines, nozzles, among others.
11/09/2023
SJVN Ltd. plans to develop a 232 MW greenfield hydroelectric plant in the village of Purthi, District- Chamba, Himachal Pradesh. WAPCOS Ltd. is preparing the DPR. Detailed survey and investigations are in progress. Mantec Consultants is preparing an EIA / EMP report for the project and it is in an advanced stage of completion. The hydrology report has been approved by the CWC. The geotechnical investigation and topographical survey report have been approved by the GSI. Forest clearance stage 1 is pending at the DFO and forest stage 2 is under process at regional office. The construction of the approach road is in under progress. WAPCOS has been selected as a PMC. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, elevators, building supports, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, Pelton turbine, pumps, spiral, casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, generator and its control panel, guide bearings, protection relays, transformer and its auxiliaries, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries, governor panel, cables, transmission lines, nozzles, among others.
07/07/2023
SJVN Ltd. plans to develop a 232 MW greenfield hydroelectric plant in the village of Purthi, District- Chamba, Himachal Pradesh. WAPCOS Ltd. is preparing the DPR. Techno-economic clearance of the project has been granted. Mantec Consultants is preparing an EIA / EMP report for the project and it is in an advanced stage of completion. The hydrology report of the project has been approved by the CWC. The geotechnical investigation and topographical survey report have been approved by the GSI. Forest clearance stage 1 is pending at the DFO and forest stage 2 is under process at nodal office. The construction of the approach roads have been started. WAPCOS has been selected as the PMC of the project. Preparation of tender is in progress for the civil works package and its specification finalization is yet to be completed. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, elevators, building supports, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, Pelton turbine, pumps, spiral, casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, generator and its control panel, guide bearings, protection relays, transformer and its auxiliaries, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries, governor panel, cables, transmission lines, nozzles, among others.
11/05/2023
SJVN Ltd. plans to develop a 232 MW greenfield hydroelectric plant in the village of Purthi, District- Chamba, Himachal Pradesh. WAPCOS Ltd. is preparing the DPR. Techno-economic clearance of the project has been granted. Mantec Consultants is preparing an EIA / EMP report for the project and it is in an advanced stage of completion. The hydrology report of the project has been approved by the CWC. The geotechnical investigation and topographical survey report have been approved by the GSI. Forest clearance stage 1 is pending at the DFO. The construction of approach roads are facing unfavorable weather condition, So the progress is slow. WAPCOS has been selected as the PMC of the project. Preparation of tender is in progress for the civil works package. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, elevators, building supports, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, Pelton turbine, pumps, spiral, casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, generator and its control panel, guide bearings, protection relays, transformer and its auxiliaries, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries, governor panel, cables, transmission lines, nozzles, among others.
01/11/2022
SJVN Ltd. along with consultant M/S WAPCOS Ltd. has prepared the pre-feasibility report for the 232 MW greenfield hydroelectric plant in the village- of Purthi, District- Chamba, Himachal Pradesh. The dam will be built on the Chenab river of the Chamba district of HP. TOR for the same project was granted. Mantec Consultants is preparing an EIA report for the same. WAPCOS is preparing DPR for the project. The hydrology report for the same has been approved by the CWC. Drilling and drifting works at the site are in progress. Forest clearance for the same is pending at the regional office. The geotechnical investigation and the topographical survey report have been approved by the GSI. The approach road construction is in progress and it was getting affected due to the unfavorable weather condition and critical geological terrain. The private land acquisition is in progress. Public hearing phase -1 has been completed and phase two is likely to be conducted on November 2022. The owner has decided to come up with a package-wise tender mode. The preparation of the tender is in progress for the project management consultant and its specification is about to finalized. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, elevators, building supports, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, Pelton turbine, pumps, spiral, casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, generator and its control panel, guide bearings, protection relays, transformer and its auxiliaries, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others.
01/09/2022
SJVN Ltd. along with consultant M/S WAPCOS Ltd. has prepared the pre-feasibility report for the 232 MW greenfield hydroelectric plant in the village- of Purthi, District- Chamba, Himachal Pradesh. The dam will be built on the Chenab river of the Chamba district of HP. TOR for the same project was granted. The owner has selected Mantect Consultants as an EIA consultant for the execution of the same project. Preparation of the EIA report is in progress. WAPCOS ltd. was selected as a DPR consultant for the same. The baseline report was accepted by the CWC and the hydrology report is in progress. Drilling and drifting works at the site are in progress. The application for forest clearance was submitted and it was pending at the nodal office. The geotechnical investigation and the topographical survey report were approved by the GSI. The approach road construction is in progress and it was getting affected due to the unfavorable weather condition and critical geological terrain. The private land acquisition is in progress. The owner has decided to come up with a package-wise tender mode. Preparation of tender is in progress for the SIA consultant. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, elevators, building supports, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, Pelton turbine, pumps, spiral, casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, generator and its control panel, guide bearings, protection relays, transformer and its auxiliaries, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others.