Uttarakhand Jal Vidyut Nigam Ltd. (UJVNL) plans to set up a 230 MW hydroelectric project in Sele village, District- Pithoragarh, State - Uttarakhand. The hydrology report has been approved by the CWC. CEA has approved the DPR of the project. Forest clearance stage 1 has been granted but stage 2 is pending at DFO. Bid evaluations are in progress for the civil works package (lot-1) and Patel Engineering, Rithwik Projects, Simplex Infrastructure, Abir Infrastructure, Gammon and L&T Infrastructure are the qualified bidders in technical bids and the price bid will be opened in the third week of March 2023. Preparation of tender for the civil works package (lot-2) is in progress and its technical specification finalized. Further bids are expected soon. The project requirements are load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator, protection relays, transformer, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries, transmission lines, among others.
27/03/2024
Uttarakhand Jal Vidyut Nigam Ltd. (UJVNL) plans to set up a 230 MW hydroelectric project in Sela village, District- Pithoragarh, State - Uttarakhand. EC and FC have been granted. Bid evaluation is in progress for the civil works package (lot-1), and Patel Engineering, Rithwik Projects, Simplex Infrastructure, Abir Infrastructure, Gammon, and L&T Infrastructure are the major contenders in the price bid. Pre-construction works are in an advanced stage for completion. Approach road construction has been completed. A prepared tender for civil works package (lot-2) is under approval stage. Further bids are expected soon. The project requirements are load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator, protection relays, transformer, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries, transmission lines, among others.
14/12/2023
Uttarakhand Jal Vidyut Nigam Ltd. (UJVNL) plans to set up a 230 MW hydroelectric project in Sela village, District- Pithoragarh, State - Uttarakhand. EC and FC has been approved. Bid evaluations are in progress for the civil works package (lot-1), and Patel Engineering, Rithwik Projects, Simplex Infrastructure, Abir Infrastructure, Gammon, and L&T Infrastructure are the major contenders in the price bid. A prepared tender for civil works package (lot-2) is under approval stage. Further bids are expected soon. The project requirements are load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator, protection relays, transformer, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries, transmission lines, among others.
09/10/2023
Uttarakhand Jal Vidyut Nigam Ltd. (UJVNL) plans to set up a 230 MW hydroelectric project in Sela village, District- Pithoragarh, State - Uttarakhand. EC and FC has been approved. Bid evaluations are in progress for the civil works package (lot-1), and Patel Engineering, Rithwik Projects, Simplex Infrastructure, Abir Infrastructure, Gammon, and L&T Infrastructure are the major contenders in the price bid. The preparation of the tender for the civil works package (lot-2) has been completed and it is under approval stage. Further bids are expected soon. The project requirements are load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator, protection relays, transformer, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries, transmission lines, among others.
13/06/2023
Uttarakhand Jal Vidyut Nigam Ltd. (UJVNL) plans to set up a 230 MW hydroelectric project in Sela village, District- Pithoragarh, State - Uttarakhand. The hydrology report has been approved by the CWC. CEA has approved the DPR. Forest clearance has been approved. Bid evaluations are in progress for the civil works package (lot-1) and Patel Engineering, Rithwik Projects, Simplex Infrastructure, Abir Infrastructure, Gammon, and L&T Infrastructure are the major contenders in the price bid. The preparation of the tender for the civil works package (lot-2) has been completed and it is under approval. Further bids are expected soon. The project requirements are load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator, protection relays, transformer, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries, transmission lines, among others.
26/04/2023
Uttarakhand Jal Vidyut Nigam Ltd. (UJVNL) plans to set up a 230 MW hydroelectric project in Sele village, District- Pithoragarh, State - Uttarakhand. The hydrology report has been approved by the CWC. CEA has approved the DPR of the project. Forest clearance stage 1 and stage 2 have been approved. Bid evaluations are in progress for the civil works package (lot-1) and Patel Engineering, Rithwik Projects, Simplex Infrastructure, Abir Infrastructure, Gammon, and L&T Infrastructure are the major contenders in the price bid. Preparation of tender for the civil works package (lot-2) is in progress and its technical specification finalized. Further bids are expected soon. The project requirements are load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator, protection relays, transformer, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries, transmission lines, among others.