National Hydroelectric Power Corporation Ltd. plans to set up a 2880 MW (12x240 MW) greenfield hydropower project in the village Munli near Roing, District:- Lower Dibang Valley, Arunachal Pradesh. DPR was prepared using in-house resources. The private land acquisition has been completed. EC of the project has been granted. L&T Infra. is constructing the approach road for the project. The owner has selected GRIL – Patel JV as a contractor for civil and hydro-mechanical works (Lot-4) and L&T Infra. (L2) and AFCONS- JAYPEE JV (L3) are major contenders in the reverse auction bidding process. Preparation of the tender is in progress for the hydro-mechanical works package (Lot-5) and its specification finalization is in progress. Further RFQs are expected soon. The project requirements are load cum excavator, hydraulic excavator, dumpers, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, fuel/water tankers, EOT crane, mobile crane, air compressor, tunnel boring machine, dozers, piles, elevators, building supports, gantry crane, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, Francis turbine, pumps, alternator and its auxiliary, power transformer, protection relays, battery bank, SCADA, unit control board, sensors, console, display panels, cables, transmission lines, nozzles, among others.