Tamil Nadu Generation and Distribution Corporation (TANGENCO) plans to construct a pump storage hydroelectric plant of capacity 1200 MW (6*200) in Village Surulipatti, Taluk Uthamapalayam, District Theni, Tamil Nadu. WAPCOS has started the preparation of DPR. A soil test at the site is in progress. Bid evaluation is in progress for the EIA package, and R.S Envirolink, Ramkey Enviro Engineers, EQMS India etc. are the major contenders. Preparation of the tender is yet to be started for the drilling works. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, six units of Pelton turbine, generator-motor, power transformer and its auxiliaries, generator-motor circuit breaker, current transformer, voltage transformer, diesel engine generator, pumps, spiral casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others.
07/08/2024
Tamil Nadu Generation and Distribution Corporation (TANGENCO) plans to construct a 1200 MW pumped storage hydroelectric plant in Village Surulipatti, Taluk Uthamapalayam, District Theni, Tamil Nadu. WAPCOS is preparing the DPR. A soil test has been completed. The hydrology study has been completed. R.S Envirolink Technologies has prepared the EIA / EMP report. Forest clearance (stage-1) is under progress at DFO. Geo-technical investigation and topographical survey works have been completed and it is yet to be approved by the GSI. Bid evaluation is in progress for the PMC tender. Preparation of the tender is yet to be started for the civil and HM works. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, six units of Pelton turbine, generator-motor, power transformer and its auxiliaries, CT and PT, pumps, spiral casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others
22/03/2024
Tamil Nadu Generation and Distribution Corporation (TANGENCO) plans to construct a 1200 MW pumped storage hydroelectric plant in Village Surulipatti, Taluk Uthamapalayam, District Theni, Tamil Nadu. WAPCOS is preparing the DPR. A soil test has been completed. The hydrology study is undergoes. Collection of three season monsoon base line data has been completed and it is under examination at CWC. R.S Envirolink Technologies is preparing the EIA / EMP report. Forest clearance (stage-1) is under progress at DFO. A tender has been floated for the geo-technical investigation and topographical survey works. Preparation of the PMC tender is in progress. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, six units of Pelton turbine, generator-motor, power transformer and its auxiliaries, CT and PT, pumps, spiral casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others
04/02/2024
Tamil Nadu Generation and Distribution Corporation (TANGENCO) plans to construct a 1200 MW pumped storage hydroelectric plant in Village Surulipatti, Taluk Uthamapalayam, District Theni, Tamil Nadu. WAPCOS is preparing the DPR. A soil test has been completed. The hydrology study is undergoes. R.S Envirolink Technologies is preparing the EIA / EMP report. Application for forest clearance has been submitted to the nodal office. Geo-technical investigation and topographical survey works (drilling works) tender has been prepared and it is under approval stage. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, six units of Pelton turbine, generator-motor, power transformer and its auxiliaries, CT and PT, pumps, spiral casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others.
10/12/2023
Tamil Nadu Generation and Distribution Corporation (TANGENCO) plans to construct a 1200 MW pumped storage hydroelectric plant in Village Surulipatti, Taluk Uthamapalayam, District Theni, Tamil Nadu. WAPCOS has started the preparation of the DPR. A soil test has been completed. R.S Envirolink Technologies is preparing the EIA report. Preparation of the tender for Geo-technical investigation and topographical works (drilling works) have been completed. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, six units of Pelton turbine, generator-motor, power transformer and its auxiliaries, CT and PT, pumps, spiral casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others.
15/09/2023
Tamil Nadu Generation and Distribution Corporation (TANGENCO) plans to construct a 1200 MW pump storage hydroelectric plant in Village Surulipatti, Taluk Uthamapalayam, District Theni, Tamil Nadu. WAPCOS has started the preparation of DPR. A soil test has been completed. R.S Envirolink has started the preparation of EIA report. Preparation of the tender is in progress for the drilling works. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, six units of Pelton turbine, generator-motor, power transformer and its auxiliaries, CT and PT, pumps, spiral casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others.