Reoli Dugli Greenfield Hydroelectric Project   
Project Code 6000004542
Project Name Reoli Dugli Greenfield Hydroelectric Project
Project Type Capital Project Status Active
Sector Power Project Stage Engineering
Project Cost Rs. 4,035.00 Cr.   Project Phase Scheduling
NIC Subcode(s) Description
35101 Electric power generation by hydroelectric power plants
Facility Name Reoli Dugli Hydroelectric Power Station Status Engineering 
Sector Power Main Energy Source Water  
Commissioning Date   Other Energy Sources Diesel  
Address SJVN Corporate Office Complex, Shanan,
Shimla*, Himachal Pradesh
171006, India
Telephone 011-42301103
Fax 011-42301113
Owner Satluj Jal Vidyut Nigam Limited Satluj Jal Vidyut Nigam Limited Website http://www.sjvn.nic.in
Operator Satluj Jal Vidyut Nigam Limited Satluj Jal Vidyut Nigam Limited Website http://www.sjvn.nic.in

Satluj Jal Vidyut Nigam Ltd. plans to develop a 456 MW greenfield hydroelectric plant in the district Lahaul-Spiti, Himachal Pradesh. It is a run-of-the-river-type project proposed to harness the hydel potential of the river Chenab. WAPCOS has completed the DPR. The hydrology report has been approved by the CWC. Detailed design and drawings have been completed and it is under the process of approval. A geotechnical investigation and topographical survey report have been approved by the GSI. Forest clearance stage-1 is under progress at DFO and wildlife clearance is pending at the wildlife warden's office. R.S Envirolink Technologies Pvt. Ltd. is preparing an EIA/EMP report and it is advanced stage for completion. Aquagreen Technologies Pvt Ltd has been selected as PMC. Package-wise bids are expected. Further bids are expected soon. The project envisages the construction of a concrete gravity dam on river Chenab near Tindi village, and of an underground powerhouse approx. 14.0 km downstream of the proposed dam site on the right bank of the river. Chenab near Tindi village, and of an underground powerhouse approx. 14.0 km downstream of the proposed dam site on the right bank of the river. The project requirements are load cum excavator, hydraulic excavator, dumpers, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, fuel/water tankers, EOT crane, mobile crane, air compressor, tunnel boring machine, dozers, piles, elevators, building supports, gantry crane, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, Pelton turbine, pumps, alternator and its auxiliary, power transformer, protection relays, battery bank, SCADA, unit control board, sensors, console, display panels, cables, transmission lines, nozzles, among others.

RFQ for the civil works package is likely to be floated on Q4 2023.

Expenditure Approval RFQ Date Release Date Start Date Completion Date Audit Date
2020 Q4:2023 Q4:2023 2023 2028 10/Oct/2023
Sell Electricity?
Name Project Role Designation Company City Phone Audit Date E-mail
Mr.Ravi Uppal Owner AGM Satluj Jal Vidyut Nigam Limited Satluj Jal Vidyut Nigam Limited Kinnaur 0177 - 2660180 02/07/2024 sjvn.ecfc@gmail.com
Mr.Vikash Mahajan Owner Additional General Manager Satluj Jal Vidyut Nigam Limited Satluj Jal Vidyut Nigam Limited Shimla* 01782 - 222030 10/10/2023
Equipments
Requirement Name Additional Details
Valves
Turbine
Transportation
Structural
Storage
Sealing
Raw material
Production Process
Process
Piping
Mechanical
Lubrication
Insulation/coating
Instrumentation
HVAC
Generator
Fire-proofing
Environmental
Electrical
Control Room
Compresssors
Communications
Civil
Auxiliary Equipment

Contracting Services
  • Electrical