Lara Super-Critical Expansion Thermal Power Project, (Stage-II)   
Project Code 6000005448
Project Name Lara Super-Critical Expansion Thermal Power Project, (Stage-II)
Project Type Capital Project Status Active
Sector Power Project Stage Engineering
Project Cost Rs. 9,415.57 Cr.  Project Phase Detailed Engineering
NIC Subcode(s) Description
35102 Electric power generation by coal based thermal power plants
Facility Name Lara Super Thermal Power Station, Stage-II Status Planning 
Sector Power Main Energy Source Coal  
Commissioning Date 2025  Other Energy Sources Fuel Oil, Water  
Address Lara Super Thermal Power Station Stage-II, Village- Chapora, P.O.: Pussore,
Raigarh, Chhattisgarh
496440, India
Telephone 07762-223454
Fax 07762-2222439
Owner National Thermal Power Corporation Limited National Thermal Power Corporation Limited Website http://www.ntpc.co.in/
Operator National Thermal Power Corporation Limited National Thermal Power Corporation Limited Website http://www.ntpc.co.in/
Company Name Company Classification
National Thermal Power Corporation Limited Detailed Feasibility Study Consultant

The EIA consultant M/S Vimta Labs has prepared the EIA report for NTPC's stage-II, 1600 MW (2x800 MW) supercritical thermal power expansion project at its existing 1600 MW (2x800 MW) thermal power complex located at Lara village, in the Raigarh district of Chhattisgarh. The DPR was prepared by the NTPC and it has been approved by CEA. NTPC has awarded BHEL as an EPC contractor for the main plant works. LOA for the same package is yet to be received. Preparation of the tender for the BTG civil works package is yet to be started. Further bids are expected soon. The project requirements are: steam turbine, generator, pulverized boiler, water-cooled condenser, vacuum pumps, boiler feed pumps, and their drives, feed pump motor, furnace system, furnace chamber, bed media and fuel feed system, air supply and distribution system, soot blowing system, ESP, chimney, ash handling system, water treatment plant, DM plant, fire fighting system, coal handling system, cooling towers, air preheater, heat exchanger, ID, FD and PA fans, HT and LT motors, turbine oil purification system, switch-yard equipment, cranes, Thermomechanically treated steel, DG sets, rolling shutters, fencing materials, down shop lead (DSL) crane, carbon steel and pipe, stacker cum reclaimer, wagon tippler, piles, reinforced steel, structural steel, MS & Electro forged gratings, conveyor belts, side arm charger, FGD, SCR, among others. The main plant package includes design, engineering, manufacture, supply, construction, erection, testing, and commissioning works for the main plant package based on single-point responsibility, completely covering the following activities and services in respect of Steam Generator, Steam Turbine Generator, Electrostatic Precipitator, NOx Control System, Flue Gas Desulphurization, Compressed air (instrument & service air) system, and air conditioning & ventilation system.

RFQ for the civil works for main plant BTG is expected by Q2 2024.

Expenditure Approval RFQ Date Release Date Start Date Completion Date Audit Date
Q3:2019 Q2:2024 Q2:2024 2024 2028 14/Feb/2025
Sell Electricity?
Buy Fuel? Fuel Name Diesel, Fuel Oil
Name Project Role Designation Company City Phone Audit Date E-mail
Mr.Vijay Goel Owner Additional General Manager National Thermal Power Corporation Limited National Thermal Power Corporation Limited Noida 0120 - 2410019 14/02/2025
Mr.B. P. Biswal Owner Additional General Manager (Contracts) National Thermal Power Corporation Limited National Thermal Power Corporation Limited Raigarh 07762 - 233790 14/02/2025 bpbishwal@ntpc.co.in
Mr.Bikram Mandal Owner GM National Thermal Power Corporation Limited National Thermal Power Corporation Limited Noida 120 - 4946662 14/02/2025 bmand@ntpc.co.in
Equipments
Requirement Name Additional Details
Valves
  • Safety Relief Valve
  • Pressure Reducing Valve
  • Rotary Valve
Utilities
  • Water
  • Fuel
Turbine
  • Steam Turbine
Transportation
  • Truck
  • Rail
Structural
  • Stacker and Reclaimer
  • Piling
  • Frame
  • Foundations
  • Elevators
  • Cranes
  • Building Supports
Storage
  • Tanks
  • Silos
  • Bulk
Sealing
  • Rubber
Piping
  • Pipe
  • Conduit
Instrumentation
  • Sensors
  • SCADA
  • PLC
  • DCS
  • Computerised Control System
Electrical
  • Transformer
  • Switchyard
  • Cables
Environmental
  • Wastewater Treatment
  • Flue-Gas Desulfurization(FGD)
  • Electrostatic Precipitator (ESP)
  • Selective Non-Catalytic reduction (SNCR)
Civil
  • Underground Piping
  • Earthwork
Boiler
  • Fire Tube
Fire-proofing
  • Pre-action (Water) Sprinkler System
  • Mulsifyer System
  • Fire Pump
Generator

Engineering Services
  • Civil
  • Electrical
  • Structural
Contracting Services
  • Civil
  • Electrical
  • Mechanical
  • Environmental
  • Instrumentation