Wah Umiam Greenfield Hydroelectric Power Project, Stage-II   
Project Code 6000005611
Project Name Wah Umiam Greenfield Hydroelectric Power Project, Stage-II
Project Type Capital Project Status Active
Sector Power Project Stage Engineering
Project Cost Rs. 550.00 Cr.   Project Phase Contracting
NIC Subcode(s) Description
35101 Electric power generation by hydroelectric power plants
Facility Name Wah Umiam Hydroelectric Plant (Stage-II) Status Planning 
Sector Power Main Energy Source Water  
Commissioning Date 2027  Other Energy Sources Diesel, Fuel Oil  
Address Wah Umiam Stage-II Hydroelectric Power Project, NEEPCO,
East Khasi Hills, Meghalaya
793001, India
Telephone 0364-2224582
Fax -
Owner North Eastern Electric Power Corporation Limited North Eastern Electric Power Corporation Limited Website http://neepco.co.in/neepco/
Operator North Eastern Electric Power Corporation Limited North Eastern Electric Power Corporation Limited Website http://neepco.co.in/neepco/

North Eastern Electric Power Corporation Ltd has signed a PPA with the Government of Meghalaya for setting up an 100 MW greenfield hydel power project in the East Khasi Hills district of Meghalaya. The site survey has been completed. WAPCOS is preparing the DPR and its detailed design and drawing has been completed. Collection of the three-season monsoon baseline data has been completed. Construction of the approach road is in progress and it is in an advanced stage of completion. EQMS India Pvt. Ltd. is preparing the EIA/EMP report. SIA works have been completed and it is under examination at Ministry of Tribal Affairs. WAPCOS also been selected as PMC. Preparation of the civil works package tender is yet to be started. Further bids are expected soon. The project requirements are load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, vertical Francis turbine, alternator, pumps, casing, transformer, battery bank, SCADA, unit control board, sensors, console, display panels, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, among others

RFQ for the civil works package is likely to be floated in Q2 2023

Expenditure Approval RFQ Date Release Date Start Date Completion Date Audit Date
2020 Q2:2023 Q2:2023 2024 2030 18/Dec/2023
Sell Electricity?
Buy Fuel? Fuel Name Diesel
Name Project Role Designation Company City Phone Audit Date E-mail
Mr.Subrata Saha Owner General Manager North Eastern Electric Power Corporation Limited North Eastern Electric Power Corporation Limited Shillong* 0361 - 2202974 13/02/2024
Mr.Gautam Kumar Owner Project Engineer North Eastern Electric Power Corporation Limited North Eastern Electric Power Corporation Limited Shillong* 03670 - 288241 28/10/2025 contract.khep@gmail.com
Equipments
Requirement Name Additional Details
Valves
  • Butterfly Valve
  • Flapper Valve
Turbine
  • Francis Turbine
Structural
  • Tunnel Boring Machine (TBM)
  • Piling
  • Frame
  • Foundations
  • Elevators
  • Cranes
Pumps
  • Hydraulic Pump
  • Centrifugal Pump
Piping
  • Pipe
  • Hoses
Generator
Electrical
  • Transmission
  • Transformer
  • Switchyard
  • Powerhouse
  • Cables
Civil
  • Earthwork
  • Excavation
  • Tunnels
  • Underground Piping
  • Drilling
  • Surveying
Auxiliary Equipment
  • Motor
Fire-proofing
  • Fire Alarm
  • Portable Fire Extinguishers (Foam/CO2 type)
Mechanical
  • Electro-mechanical

Engineering Services
  • Civil
  • Electrical
  • Mechanical
Contracting Services
  • Civil
  • Electrical
  • Mechanical