JSW Energy PSP Three Ltd, a subsidiary of JSW Energy Ltd. plans to build a 300(2*150) MW standalone pump storage project at Village Doni Malai and Taranagar, Tehsil Sandur, District Ballari, (Karnataka). TOR has been granted. R.S Envirolink Technologies appointed as an EIA consultant. Aquagreen has been selected as a DPR consultant. Preparation of the tender is yet to be started for the geotechnical investigation and topographical works. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, reversible pump-turbine (Francis type), alternator, Cooling water system, Drainage & Dewatering System, HP / LP Compressed Air, power transformer and its auxiliaries, CT&PT, pumps, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, battery bank, SCADA, unit control board, sensors, console, display panels, GIS, cables, transmission lines, nozzles, among others.
28/11/2024
JSW Energy PSP Three Ltd., a subsidiary of JSW Energy Ltd., plans to build a 300 MW (2x150 MW) standalone pumped storage project at Village Doni Malai and Taranagar, Tehsil Sandur, District Ballari, Karnataka. The Terms of Reference (TOR) have been granted, and R.S. Envirolink Technologies is preparing the Environmental Impact Assessment (EIA) report. Stage-1 forest clearance has been granted the Divisional Forest Office (DFO). Baseline data collection for three monsoon seasons has been completed. Aquagreen Engineering is responsible for preparing the Detailed Project Report (DPR), and its detailed design and drawing has been completed. TEC is yet to be granted. Geotechnical investigation and topographical works have been completed and it has been approved by the Geological Survey of India (GSI). Mantech is preparing the Social Impact Assessment (SIA) report. Preparation of the hydrology report has been completed. Private land acquisition has yet to commenced, and tender preparation has been completed for the Project Management Consultant (PMC). Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, reversible pump-turbine (Francis type), alternator, Cooling water system, Drainage & Dewatering System, HP / LP Compressed Air, power transformer and its auxiliaries, CT&PT, pumps, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, battery bank, SCADA, unit control board, sensors, console, display panels, GIS, cables, transmission lines, nozzles, among others
28/08/2024
JSW Energy PSP Three Ltd, a subsidiary of JSW Energy Ltd. plans to build a 300(2*150) MW standalone pumped storage project at Village Doni Malai and Taranagar, Tehsil Sandur, District Ballari, (Karnataka). TOR has been granted. R.S Envirolink Technologies is preparing the EIA report. Forest clearance (stage-1) is under progress at DFO. Collection of three season monsoon baseline data has been completed. Aquagreen is preparing the DPR. Geotechnical investigation and topographical works are in progress. Mantech has been selected as SIA consultant. Preparation of the tender is in progress for the PMC. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, reversible pump-turbine (Francis type), alternator, Cooling water system, Drainage & Dewatering System, HP / LP Compressed Air, power transformer and its auxiliaries, CT&PT, pumps, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, battery bank, SCADA, unit control board, sensors, console, display panels, GIS, cables, transmission lines, nozzles, among others
16/04/2024
JSW Energy PSP Three Ltd, a subsidiary of JSW Energy Ltd. plans to build a 300(2*150) MW standalone pumped storage project at Village Doni Malai and Taranagar, Tehsil Sandur, District Ballari, (Karnataka). TOR has been granted. R.S Envirolink Technologies is preparing the EIA report. Forest clearance (stage-1) is under progress at regional office. Collection of three season monsoon baseline data is under progress. Aquagreen is preparing the DPR. Tender has been floated for the geotechnical investigation and topographical works. Preparation of the tender is in progress for the SIA consultant. Further bids are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, reversible pump-turbine (Francis type), alternator, Cooling water system, Drainage & Dewatering System, HP / LP Compressed Air, power transformer and its auxiliaries, CT&PT, pumps, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, battery bank, SCADA, unit control board, sensors, console, display panels, GIS, cables, transmission lines, nozzles, among others.