North Eastern Electric Power Corporation Ltd. (NEEPCO) plans to develop a 186 MW greenfield hydroelectric power project in Yarjep river basin, Siyom Village of West Siang District in Arunachal Pradesh. Tractebel Engineering Pvt. Ltd has prepared the DPR. GreenC India Pvt Ltd is preparing the EIA report and it is in an advanced stage for completion. The owner has selected Tractebel as PMC. ARK Geo Drill(2025_NEEPC_232228_1) has been selected as a contractor for drilling and drifting works. IRCON International has been selected as civil works package(2024_NEEPC_212324_1) contractor and in the Patel Engineering was the major contender in the same package. P&R Infra. Projects has been selected as a contractor in HM works package(2024_NEEPC_220461_1) and ABIR infra was rejected in price bid. Financial bid has been opened for EM package(2025_NEEPC_224505_1) and Vioth has under cut BHEL with 2% lower bid. However LOA for EM package is yet to be awarded. Further bids are expected soon. The project requirements include load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator and its control panel, guide bearings, protection relays, transformer, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries cables, transmission lines, among others
11/06/2024
North Eastern Electric Power Corporation Ltd. (NEEPCO) plans to develop a 186 MW greenfield hydroelectric power project in Yarjep river basin, Siyom Village of West Siang District in Arunachal Pradesh. Tractebel Engineering Pvt. Ltd has prepared the DPR. GreenC India Pvt Ltd is preparing the EIA report and it is in an advanced stage for completion. The owner has selected Tractebel as PMC. Preparation of the tender is yet to be started for the civil and HM works. Further bids are expected soon. The project requirements include load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator and its control panel, guide bearings, protection relays, transformer, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries cables, transmission lines, among others
07/03/2024
North Eastern Electric Power Corporation Ltd. (NEEPCO) plans to develop a 186 MW greenfield hydroelectric power project in Yarjep river basin, Siyom Village of West Siang District in Arunachal Pradesh. Tractebel Engineering Pvt. Ltd is preparing the DPR. GreenC India Pvt Ltd is yet to started the modification of EIA report. A tender has been floated for the PMC. Further bids are expected soon. The project requirements include load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator and its control panel, guide bearings, protection relays, transformer, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries cables, transmission lines, among others.
05/12/2023
North Eastern Electric Power Corporation Ltd. (NEEPCO) plans to develop a 186 MW greenfield hydroelectric power project in Yarjep river basin, Siyom Village of West Siang District in Arunachal Pradesh. An MOU has been signed between the government of Arunachal Pradesh and NEEPCO. Tractbeel Engineering Pvt. Ltd has started the preparation of the DPR. Preparation of the tender for the EIA consultant is in progress. Further bids are expected soon. The project requirements include load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator and its control panel, guide bearings, protection relays, transformer, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries cables, transmission lines, among others.
19/06/2023
North Eastern Electric Power Corporation Ltd. (NEEPCO) plans to develop a 186 MW greenfield hydroelectric power project in Yarjep river basin, Siyom Village of west Siang District in Arunachal Pradesh. An MOU has been signed between the government of Arunachal Pradesh and NEEPCO. Preparation of the tender is in progress for the DPR consultant. Further bids are expected soon. The project requirements include load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator and its control panel, guide bearings, protection relays, transformer, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries cables, transmission lines, among others.