Kurung Hydro Electric Project   
Project Code 6000006506
Project Name Kurung Hydro Electric Project
Project Type Capital Project Status Active
Sector Power Project Stage Planning
Project Cost Rs. 3,408.00 Cr.  Project Phase Site Selection
NIC Subcode(s) Description
35101 Electric power generation by hydroelectric power plants
Facility Name Kurung Hydro Electric Project Status Planning 
Sector Power Main Energy Source Water  
Commissioning Date   Other Energy Sources  
Address Muiri Village Kra Daadi
Kurung Kumey, Arunachal Pradesh
791001, India
Telephone 0364 -2220014
Fax -
Owner North Eastern Electric Power Corporation Limited North Eastern Electric Power Corporation Limited Website http://neepco.co.in/neepco/
Operator North Eastern Electric Power Corporation Limited North Eastern Electric Power Corporation Limited Website http://neepco.co.in/neepco/

North Eastern Electric Power Corporation Ltd. (NEEPCO) plans to develop a 330 MW greenfield hydroelectric power project in Muiri Village, Kra Daadi District, Arunachal Pradesh. Aquagreen Engineering has been selected as the Detailed Project Report (DPR) consultant, and the preparation of the DPR is currently in progress. Arihant Drilling has been appointed as the contractor for drilling works, while ARK Geo Drill has been selected as the contractor for drifting works(2024_NEEPC_182759_1). Both drilling and drifting works are actively underway. R.S Envirolink is preparing the Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) report. The hydrology report is also under preparation. Construction of the approach road is progressing, and the Stage-1 Forest Clearance is under review at the Divisional Forest Office (DFO).. Further bids are expected soon. The project requirements include load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator and its control panel, guide bearings, protection relays, transformer, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries cables, transmission lines, among others.

RFQ for the civil work package is likely to be floated in Q1 2026

Expenditure Approval RFQ Date Release Date Start Date Completion Date Audit Date
2023 Q1:2026 Q1:2026 2026 2029 28/Oct/2025
Sell Electricity?
Name Project Role Designation Company City Phone Audit Date E-mail
Mr.C. Lalmuanpuia Owner Senior Engineer North Eastern Electric Power Corporation Limited North Eastern Electric Power Corporation Limited Shillong* 8014014803 28/10/2025
Mr.Gautam Kumar Owner Project Engineer North Eastern Electric Power Corporation Limited North Eastern Electric Power Corporation Limited Shillong* 03670 - 288241 28/10/2025 contract.khep@gmail.com
Equipments
Requirement Name Additional Details
Valves
Utilities
Turbine
Transportation
Structural
Storage
Sealing
Raw material
Pumps
Production Process
Process
Piping
Packaging
Mechanical
Lubrication
Insulation/coating
Instrumentation
HVAC
Heat transfer
Generator
Fire-proofing
Environmental
Electrical
Control Room