Uttarakhand Jal Vidyut Nigam Ltd.( UJVNL) plans to develop a 120 MW (3*40)) hydro power project on the Goriganga River in the Munsiyari village of Pithoragarh district in Uttarakhand. DPR has been approved, and the hydrology report has been approved by the CWC. EQMS India Pvt Ltd has modified the EIA/EMP report and it has been approved by the MoEF.EC has been granted. Forest stage-1 has been granted. Aravee Associates has been selected as PMC. Earlier tender for civil works packages and HM package have been cancelled due to internal issue. Re-tender for construction of feeder tunnel, desander, Hrt, Sft, surge shaft, valve house, Adits and its appurtenant works and associated project roads (2025_UJVN_87949_1) has been floated and its bid submission date has been extended up to 7th Nov. 2025. Tender for the construction of Coffer dam, barrage, intake and its appurtenant works including river diversion works, hydro mechanical works and associated project roads and bridges(2025_UJVN_87943_1). Preparation of the tender for the EM package is in progress and its specification is yet to be finalized. Further bids are expected soon. The project requirements include equipment such as load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator and its control panel, guide bearings, protection relays, transformer, and its auxiliaries, lightning arrester panels, excitation system, and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, and transmission lines, among others.
03/01/2024
Uttarakhand Jal Vidyut Nigam Ltd.( UJVNL) plans to develop a 120 MW (3*40)) hydro power project on the Goriganga River in the Munsiyari village of Pithoragarh district in Uttarakhand. DPR has been approved by the CEA, and the hydrology report has been approved by the CWC. EQMS India Pvt Ltd has modified the EIA/EMP report and it has been approved by the MoEF. SIA work has been completed and it has been approved by the Ministry of Tribal Affairs. Forest and wildlife clearances have been granted. Aravee Associates has been selected as PMC. Preparation of the tender for the civil works package (lot-1) has been completed but it is pending at board level. Preparation of the civil works package (lot-2) tender is in progress. Further bids are expected soon. The project requirements include equipment such as load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator and its control panel, guide bearings, protection relays, transformer, and its auxiliaries, lightning arrester panels, excitation system, and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, and transmission lines, among others.
15/11/2023
Uttarakhand Jal Vidyut Nigam Ltd.( UJVNL) plans to develop a 120 MW (3*40)) hydro-power project on the Goriganga River in the Munsiyari village of the Pithoragarh district in Uttarakhand. The Techno Economic Clearance (TEC) for the DPR has been approved by the CEA, and the hydrology report has been approved by the Central Water Commission. EQMS India Pvt Ltd has modified the EIA/EMP report and it has been approved by the MoEF. SIA work has been completed and it has been approved by the Ministry of Tribal Affairs. Forest and wildlife clearances have been granted. Aravee Associates has been selected as the PMC. The preparation of the tender for the civil works package (lot-1) has been completed and it is yet to be approved. Preparation of the tender is in progress for the civil works package (lot-2) and its specification is yet to be finalized. Further bids are expected soon. The project requirements include equipment such as load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator and its control panel, guide bearings, protection relays, transformer, and its auxiliaries, lightning arrester panels, excitation system, and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, and transmission lines, among others.
16/06/2023
Uttarakhand Jal Vidyut Nigam Ltd.( UJVNL) plans to develop a 120 MW (3*40)) hydro-power project on the Goriganga River in the Munsiyari village of the Pithoragarh district in Uttarakhand. The Techno Economic Clearance (TEC) for the Detailed Project Report (DPR) has been approved by the CEA, and the hydrology report has been approved by the Central Water Commission. EQMS India Pvt Ltd has completed the modification of the EIA/EMP report and it has been approved by the MoEF. SIA work has been completed and it is yet to approved by the Ministry of Tribal Affairs. Forest clearance stage-2 is pending at the DFO. Wildlife clearance has been granted by the wildlife warden. Aravee Associates has been selected as the PMC. The preparation of the tender for the civil works package (lot-1) has been completed. Preparation of tender is in progress for the civil works package (lot-2). Further bids are expected soon. The project requirements include equipment such as load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator and its control panel, guide bearings, protection relays, transformer, and its auxiliaries, lightning arrester panels, excitation system, and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, and transmission lines, among others.
01/05/2023
Uttarakhand Jal Vidyut Nigam Ltd. plans to develop a 120 MW (3*40)) hydro-power project on the Goriganga River in the Munsiyari village of the Pithoragarh district in Uttarakhand. The Techno Economic Clearance (TEC) for the Detailed Project Report (DPR) has been approved by the CEA, and the hydrology report has been approved by the Central Water Commission. EQMS India Pvt Ltd has completed the modification of the EIA/EMP report and which is under examination at MoEF. Forest clearance stage-1 has been granted, but stage-2 is pending at the DFO. Wildlife clearance has been granted by the wildlife warden. Aravee Associates has been selected as the PMC. The preparation of the tender for the civil works package (lot-1) is in progress and its specification has been finalized. Preparation of tender is yet to be started for the civil works package (lot-2). Further bids are expected soon. The project requirements include equipment such as load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator and its control panel, guide bearings, protection relays, transformer, and its auxiliaries, lightning arrester panels, excitation system, and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, and transmission lines, among others.
18/04/2023
Uttarakhand Jal Vidyut Nigam Ltd. plans to develop a 190 MW (4*47.5) hydro-power project on the Goriganga River in the Munsiyari village of the Pithoragarh district in Uttarakhand. The Techno Economic Clearance (TEC) for the Detailed Project Report (DPR) has been approved by the CEA, and the hydrology report has been approved by the Central Water Commission. EQMS India Pvt Ltd has completed the modification of the EIA/EMP report and which is under examination at MoEF. Forest clearance stage-1 has been granted, but stage-2 is pending at the DFO. Wildlife clearance has been granted by the wildlife warden. Aravee Associates has been selected as the PMC. The preparation of the tender for the civil works package (lot-1) is in progress and its specification has been finalized. Preparation of tender is yet to be started for the civil works package (lot-2). Further bids are expected soon. The project requirements include equipment such as load cum excavator, hydraulic excavator, jackhammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air-water jet blaster, drilling machines, DG sets, EOT crane, mobile crane, air compressor, tunnel boring machine (TBM), dozers, piles, gates, and hydraulic hoists, spillway stop logs, valves, nozzles, intake trash rack, wheel gates, trash rack cleaning machine, penstock, actuation system, vertical Francis turbine, pumps, casing, runner blades, guide vanes, oil pressure unit, seal, generator and its control panel, guide bearings, protection relays, transformer, and its auxiliaries, lightning arrester panels, excitation system, and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas-insulated switch-gear, and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, and transmission lines, among others.