Greenko Energies Pvt. Ltd. plans to develop a 2560 MW standalone pumped storage project in Sukhpura, Chittorgarh district of Rajasthan. R.S Envirolink Technologies Pvt. Ltd. has prepared the EIA / EMP report and it has been approved by MoEF. Tata Consulting Engineers has prepared the DPR. EC and FC have been granted. Public hearing has been completed. The wildlife clearance has been granted. Bid evaluations are in progress for the electro-mechanical (EM) work package, and GE Renewables, Voith Hydro, Andritz, and BHEL are the major contenders in price bids. The owner is facing some issues with land acquisition as a result EM tender awarding is delaying. Civil and hydro-mechanical (HM) package tender preparation has been completed and it is under the process of approval. Further bids are expected soon. The project requirements are load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, seven units of vertical shaft reversible pump-turbine (Francis type), generator-motor, power transformer, and its auxiliaries, generator-motor circuit breaker, current transformer, voltage transformer, diesel engine generator, pumps, spiral casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others.
06/02/2024
Greenko Energies Pvt. Ltd. plans to develop a 2560 MW standalone pumped storage project in Sukhpura, Chittorgarh district of Rajasthan. R.S Envirolink Technologies Pvt. Ltd. has prepared the EIA / EMP report and it has been approved by MoEF. Tata Consulting Engineers has prepared the DPR. EC and FC have been granted. The wildlife clearance has been granted. Bid evaluations are in progress for the electro-mechanical (EM) work package, and GE Renewables, Voith Hydro, Andritz, and BHEL are the major contenders in price bids. The owner is facing some issues with land acquisition as a result EM tender awarding is delaying. Civil and hydro-mechanical (HM) package tender preparation has been completed and it is under the process of approval. Further bids are expected soon. The project requirements are load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, seven units of vertical shaft reversible pump-turbine (Francis type), generator-motor, power transformer, and its auxiliaries, generator-motor circuit breaker, current transformer, voltage transformer, diesel engine generator, pumps, spiral casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others.
15/11/2023
Greenko Energy Pvt. Ltd. plans to develop a 2560 MW standalone pumped storage project in Sukhpura, Chittorgarh district of Rajasthan. R.S Envirolink Technologies Pvt. Ltd. has prepared the EIA / EMP report and it has been approved by MoEF. Tata Consulting Engineers has prepared the DPR. EC and FC has been granted. The wildlife clearance has been granted. Private land acquisition has been completed. Bid evaluations are in progress for the electro-mechanical (EM) works package, and GE Renewables, Voith Hydro, Andritz, and Bhel are the major contenders in price bids. The preparation of the tender for civil and hydro-mechanical (HM) works has been completed and it is under the process of approval. Further bids are expected soon. The project requirements are load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, seven units of vertical shaft reversible pump-turbine (Francis type), generator-motor, power transformer, and its auxiliaries, generator-motor circuit breaker, current transformer, voltage transformer, diesel engine generator, pumps, spiral casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others.
19/07/2023
Greenko Energy Pvt. Ltd. plans to develop a 2560 MW standalone pumped storage project in Sukhpur, Chittorgarh district of Rajasthan. R.S Envirolink Technologies Pvt. Ltd. has prepared the EIA / EMP report and it has been approved by MoEF. Tata Consulting Engineers has prepared the DPR. EC and FC has been granted. The application for Wildlife clearance has been approved by the wildlife warden. Private land acquisition has been completed. Bid evaluations are in progress for the electro-mechanical works package, and GE Renewables, Voith Hydro, Andritz, and Bhel are the major contenders in price bids. The preparation of tender for civil and hydro-mechanical (HM) works has been completed and it is under the process of approval. Further bids are expected soon. The project requirements are load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, seven units of vertical shaft reversible pump-turbine (Francis type), generator-motor, power transformer, and its auxiliaries, generator-motor circuit breaker, current transformer, voltage transformer, diesel engine generator, pumps, spiral casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others.
26/04/2023
Greenko Energy Pvt. Ltd. plans to develop a 2560 MW standalone pumped storage project in Sukhpur, Chittorgarh district of Rajasthan. R.S Envirolink Technologies Pvt. Ltd. has prepared the EIA / EMP report and it has been approved by MoEF. Tata Consulting Engineers has prepared the DPR. EC has been granted by MoEF. Forest clearance stage 1 and stage 2 have been granted by the DFO. The application for Wildlife clearance has been approved by the wildlife warden. Private land acquisition has been completed. Bid evaluations are in progress for the electro-mechanical works package, and GE Renewables, Voith Hydro, Andritz, and Bhel are the major contenders in price bids. The preparation of tender for hydro-mechanical works is in progress, and its specification has been finalized. Further bids are expected soon. The project requirements are load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, seven units of vertical shaft reversible pump-turbine (Francis type), generator-motor, power transformer, and its auxiliaries, generator-motor circuit breaker, current transformer, voltage transformer, diesel engine generator, pumps, spiral casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others.
11/01/2023
Greenko Energy Pvt. Ltd. plans to develop a 2560 MW standalone pumped storage project in Sukhpur, Chittorgarh district of Rajasthan. R.S Envirolink Technologies Pvt. Ltd. has prepared the EIA /EMP report and it has been approved by MoEF. Tata Consulting Engineers has prepared the DPR. EC has been granted by MoEF. Forest clearance stage 1 and stage 2 have been granted by the DFO. The application for WL clearance has been approved by the wildlife warden. Private land acquisition has been completed. Earlier, the owner floated a tender for the electro-mechanical works package. GE renewables, Voith Hydro, Andritz, and Bhel are the qualified bidders in the technical bid. The price bid will be started from the first week of February 2023. The preparation of tender for hydromechanical works is in progress and its specification is yet to be finalized. Further bids are expected soon. The project requirements are load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, electric overhead traveling crane (EOT crane), mobile crane, air compressor, tunnel boring machine, dozers, piles, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, seven units of vertical shaft reversible pump-turbine (Francis type), generator-motor, power transformer, and its auxiliaries, generator-motor circuit breaker, current transformer, voltage transformer, diesel engine generator, pumps, spiral casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, guide bearings, protection relays, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others.